Finalize temple VSAs in the PAC Tool: transcript

This transcript was generated automatically from the recording and may contain errors. It has not been manually verified. Time links return to that point in the video.

00:00:01 In this video, we're going to go into the PAC Tool and we're going to finalize some volunteer service assignments. We're going to use the Phoenix Temple as our example here. First thing you want to do is make sure you've got your shifts set up the way you want them. The only thing important here is the times. The descriptions here are optional. The time frame should be set up.

00:00:31 be really all that's needed there, you're going to have a start time and an end time,

00:00:36 and you'll see dates here, but the dates are unimportant, as long as the date showing

00:00:42 for the start time is identical to the date showing for the end time for each item here.

00:00:51 The only exception would be is if you've got an overnight shift, but if you have a different

00:00:57 date on the end time you're going to end up with a corruption of the number of

00:01:03 hours that are needed. Under task you want to make sure you have days of the week

00:01:08 identified and then you're going to create work shifts, work and work shifts.

00:01:14 The work items will consist of a combination of a range of dates with a

00:01:23 group of days or an individual day and within each work item there will be at

00:01:31 least one work shift that will be defined that will indicate the number of

00:01:38 people that indicate the shift that they're on and the days of the week and

00:01:43 whether it's daily or weekly and if it's daily it means that you're gonna have

00:01:49 even if you're doing multiple days of the week it's going to have a different

00:01:52 stake assigned. In this particular case we want 16 people with two stakes and so

00:01:58 we're going to double check all of the work items here. In this particular

00:02:05 temple we have closure cleanings in May and November so we have a January

00:02:12 through May open date then we have the cleaning daily cleaning in June and

00:02:19 November and we have daily cleaning in November and December. You'll notice that

00:02:24 the closure dates do not have any assignments. In this particular temple

00:02:30 there are no assignments during the closure dates. If there were assignments

00:02:35 for the closure dates those would need to be defined. Now sometimes people come

00:02:40 to me and they'll say, well, if we're not going to have assignments during the closure dates,

00:02:47 can we reduce the number of these date ranges to be the whole year? And the answer is you could.

00:02:55 The problem with that is that if you do a annual range of dates on any of these work shifts,

00:03:02 then there will be assignments made during the closure periods unless you have defined

00:03:09 the holiday schedule or the non-VSA schedule to include every single day in

00:03:16 the closure periods. The non-VSA schedule does not allow for a range of dates and

00:03:24 so unless you're willing to go in for every single day of a closure period and

00:03:28 say no VSA's on that date it's easier just to have the three cleaning periods

00:03:37 reflected in separate date ranges here. So we have a date range from January to May, we have date range from November, I mean from June to November, and a date range from November to the end of the year.

00:03:53 And that's appropriate. Now when you're done with the work and the work shifts and everything looks okay, you'll notice that right now they say they're unapproved

00:04:04 and we're going to approve them. So we're going to click on this checkbox next to

00:04:11 the to the name column and identify all of them. You could individually approve

00:04:19 them but I don't see a purpose in that and then you're going to click on approve.

00:04:25 Now that starts the process of actually generating volunteer service

00:04:31 assignments. So we're going to click on the volunteer service assignments tab here,

00:04:38 and you'll see that the days in this days assigned column are starting to be

00:04:43 filled in, and you can refresh this as often as you want, and every time you do

00:04:50 that you'll see more and more are being filled in, and you're going to want to

00:04:54 see that these are done for the for the full year. In this particular temple there

00:04:59 aren't that many assignments and so it's not going to take as long as it will for other temples.

00:05:06 But again you can click refresh. Now we've had a couple occasions where this refreshing

00:05:11 doesn't seems to get stuck and refreshing doesn't seem to fill in all the days. If that happens to you

00:05:19 go up to the top refresh button and click on that. Now that'll take you out of the volunteer

00:05:25 volunteer service assignment screen, you need to come back for that.

00:05:28 But then you'll have a more up-to-date version here.

00:05:33 In the worst case scenario, you could, to refresh it, you would come back to annual VSA planning

00:05:40 and come back to this specific temple that you want to come into and then click on volunteer

00:05:47 service assignments.

00:05:48 And then, again, that will be more refreshed.

00:05:50 and so but you just need to be patient until all of the days are filled in

00:05:57 under days assignment. I'm going to pause the video until that's complete. Once you

00:06:04 can see that all the days are filled in you can look at the assignments and make

00:06:08 sure that they're consistent with the schedule that you thought you were

00:06:13 creating, the number of hours, the number of volunteers, the total volunteers, and

00:06:20 and the number of, total number of volunteer hours.

00:06:25 And you can just scroll through that.

00:06:26 You can use the outer scroll bar to get down farther.

00:06:29 You can use the inner scroll bar to see it.

00:06:33 But you can look through the whole year,

00:06:35 make sure that's all right.

00:06:37 You can, there are no stake assignments yet

00:06:41 because we haven't got that far.

00:06:43 But you can sort this by days.

00:06:45 You can sort it by the shift start, which is the default.

00:06:48 and you can take a look at that make sure that everything's consistent all

00:06:52 through the year. Once you're satisfied that these are accurate then the next

00:06:59 step is to assign stakes to these assignments. Now ostensibly you could go

00:07:07 through each one individually, click on the name of this assignment, look up a

00:07:18 make an assignment here. We're not going to do that in this particular

00:07:23 temple there while I did inadvertently

00:07:28 do that. I want to clear that off and

00:07:32 then save and close. So we have no

00:07:37 stake assignments here and we're just going to go up here to the top

00:07:42 and click on auto assign volunteers.

00:07:45 And again, this is a process that is going to take a while to do.

00:07:51 It will refresh as it completes.

00:07:53 It will start filling in stakes under the stake column.

00:07:58 And you can click refresh as often as you like.

00:08:02 And the same thing that applied to the others.

00:08:05 If it seems to get frozen, you can click the refresh button here and then come back to

00:08:12 volunteer service assignments. And I'm going to pause this until it's completely filled in.

00:08:23 Once the process is filled in all the stakes, now you have your VSA schedule and it's time to review

00:08:29 it. You're going to go through this and make sure that there's no stake that's unduly

00:08:36 burdened. You can look at the stake allocations and see what's done here. You can click on

00:08:43 shift stake summary to get a view of how it's been allocated by by-stakes and

00:08:48 how the assignments are are shared. Of course this is done through a process of

00:08:54 stake memberships and allocating equitably based on that. Now there are

00:09:02 sometimes where you might say okay there are some stakes that are far away

00:09:07 from the temple maybe they need to be relieved of some of the responsibility

00:09:11 you can go into any of these items and edit it and change the assignment to a

00:09:16 different stake. If you want to look at what a stake, a particular stake has, you

00:09:21 can filter by a stake and say I want to look at just what one stake has and it

00:09:29 will give you the list of what's for that stake and you can look and make sure

00:09:34 that there aren't too many assignments close together and that the assignments

00:09:38 are spread out roughly equally or equitably around the year and you can do

00:09:45 that steak by steak. Another thing is that you can export this spreadsheet and

00:09:54 you can get a little more filtering possibility if you do that you can say

00:09:58 I want to export this to an Excel spreadsheet and save that and then open

00:10:05 open that up in Excel.

00:10:09 The Excel spreadsheet is formatted in what we call a table view, which is very useful

00:10:22 in being able to sort things and filter things.

00:10:27 So for example, if you just want to see one stake, you can unselect all and just pick

00:10:33 a particular stake and see what their stake assignments are. And now it's going to be

00:10:39 defaulted by the shift star time, which is not bad. You can see again what's there and

00:10:45 the number of volunteers, hours and everything that's going on here. You can filter this

00:10:53 by different steaks so that you can see one steak at a time and this spread sheet

00:11:03 is useful for sharing this information with the temple and others. Once you have

00:11:15 reviewed the next step really is to take the shifts after you've made any

00:11:27 adjustments that you need and you've got it the way you want it then you want to

00:11:31 use that spreadsheet the entire spreadsheet unfiltered so you want to

00:11:36 select all the stakes and you want to share that with the temple and make sure

00:11:42 that this is a workable schedule, that it's consistent with their requests, and they can

00:11:48 review it with a fine-tooth comb to make sure that everything that they need to be done

00:11:53 has an assignment and that it's been allocated to a stake.

00:11:59 Once the stake has, I mean once the temple has approved this, then you want to take some

00:12:08 of the stake data, stake by stake, and share it with the stakes.

00:12:12 Now you do not want to send this spreadsheet as it is now to the stakes because we do not

00:12:17 want the stakes to have any information aside from their own stakes information.

00:12:24 So if we're picking a particular stake, we take this spreadsheet, we highlight the fields,

00:12:35 the lines that we want copied and then we can copy that into a new spreadsheet and paste

00:12:43 that there and then you then you don't have other stake's data that you're sharing with

00:12:52 other stakes. This will not have the data from the other stakes in it. Even though on

00:12:58 this one you filtered it, the other stake's data is still in it and they could unfilter.

00:13:04 We don't want steaks comparing with each other, so we encourage you to make a separate spreadsheet

00:13:11 for the steak with just that steak's data before you share it with them.

00:13:16 So once you have submitted it to the steaks and they've approved it, then the next step

00:13:24 is to approve all of them and you can just click Submit All and it will through, approve

00:13:31 everything.

00:13:31 Now, of course, if they don't approve it and you need to make changes, you want to make

00:13:36 those changes and get those approved before you submit them.

00:13:40 Now once you click submit all, then the final step for that is to let your support advisors

00:13:51 know that you've done that and that it's ready to go.

00:13:55 And then the support advisors will advise the service mission office that this is done

00:14:00 for this particular temple, and then they can send it on to the area of

00:14:05 presidency for their approval. Once the area of presidency has approved it, then

00:14:10 we can take the the final version and share it with the stakes. Again, if there

00:14:17 are no changes, you can just confirm that there are no changes, or you can share an

00:14:22 updated spreadsheet with them, just like you did before. The, in addition to the

00:14:30 sharing that you do, the service mission officer, I mean, the PAC tool itself will

00:14:37 automatically generate a connection to the leadership and clerk resources, the

00:14:41 LCR system, and the assignments will be available there, and the status will,

00:14:50 after you submit them, will show us submitted, and everything will be done for

00:14:55 that particular operation. Now, if you decide at any juncture that you have made a mistake,

00:15:04 you want to start over, that you don't want to approve these yes, you want to undo all

00:15:09 the assignments that are being made, you can come back to the main pack tool, plan details

00:15:15 page, go down to the work section at the bottom, highlight all of these things and click

00:15:25 it will eventually delete all the VSA assignments. Now before that improved we

00:15:33 had a correct number for the number of VSA's and it would have eventually if we

00:15:39 had let it percolate long enough this number of unassigned VSA's would have gone

00:15:45 to zero and but this gives you a summary of of that. Now we're going to hit

00:15:53 refresh here, and it will now show that these are unapproved, and if we go to volunteer

00:16:02 circuit assignments and we hit refresh, the VSA's eventually will go away because we

00:16:11 we undid everything. So that is the way that VSA's are approved and reviewed and submitted

00:16:23 and then finalized. If you have questions, let me know.

Return to the video